The project
Metro Parc North is Baron Property Group's 661-unit, 8-story transit-oriented rental apartment project at 955 E 26th Street in Hialeah, Phase 2 of its Metro Center development beside the 559-unit Metro Parc. Groundbreaking was held in February 2025 and the building topped out in late March 2026.
Studios to three-bedroom rentals with more than 15,000 square feet of retail sit adjacent to the Hialeah Metrorail and Tri-Rail station. Rents are not yet published with completion guided to late 2027; as a rental project it is evaluated through the lease market, not a condo purchase.
Project snapshot
Metro Parc North at a glance.
The facts below are drawn from this guide and from the developer's published materials. Where a fact is not verified, the page says so plainly rather than guessing.
- Location / County
- Hialeah, Miami-Dade County
- Residence types
- Studio-3 bedroom rentals
- Status
- Under Construction
- Estimated completion
- Late 2027 (est.)
- Published pricing
- Rents not yet published
- Developer
- Baron Property Group
- Rental restrictions
- Residential leases set by the landlord at launch
Information reviewed October 2026. Prices, availability, and completion dates change frequently. Confirm current terms with the developer or a licensed advisor.
- 661 units, 8 stories, groundbreaking February 2025: Source: Florida YIMBY, February 2025
- Topped out at 955 E 26th Street, late March 2026: Source: Florida YIMBY and Hoodline, March 2026
- $206M construction loan from Post Road Group: Source: The Real Deal, March 2025
- Developer portfolio and Metro Center context: Source: Baron Property Group portfolio, verified October 2026
Sources consulted for this guide
- Baron Property Group portfolio
- Florida YIMBY groundbreaking, February 2025
- Florida YIMBY topping out, March 2026
- The Real Deal construction loan, March 2025
- Multi-Housing News groundbreaking, February 2025
Source links open in a new tab and are provided for verification only. Facts carry the verification date recorded above; prices, availability, and timelines change and require sales-gallery confirmation.
Verified facts carry the source links above, each pointing to the original public source where one is available. Everything else on this page is marked Not verified or Contact for current information. This page never hosts or hotlinks external files, renderings, brochures, or floor plans; where a document exists only on the developer's site, the source link above is the reference.
At a glance
Metro Parc North in Hialeah, in numbers.
County
Miami-Dade
City
Hialeah
Neighborhood
Hialeah
Developer
Baron Property Group
Address
955 E 26th Street, Hialeah, FL (earlier filings cited 983 E 26th Street)
Price range
Rental community; rents not yet published
Starting price
Rents on request
Residences
661 rental apartments
Floors
8
Sales availability
Rental lease-up planned; topped out late March 2026
Est. completion
Late 2027 (est.)
Residence types
Studio-3 bedroom rentals, Retail
Construction status
Under Construction
Property category
Rental apartments (mixed-use)
Design & architecture
Architecture by Modis Architects; general contractor KAST Construction
Official website
Contact for current information
Gallery
Renderings and interiors.
Developer renderings and interior imagery are updated as phases release. Current documents are shared privately with registered buyers.
Interior renderings on request
Floor plans on request
Pricing & availability
What Metro Parc North costs today.
The advertised starting price is the developer's published entry point. Available units, real pricing bands, and incentives change as phases sell, so we confirm current terms with the sales team before you commit capital.
- Advertised starting price
- Rents on request
- Published price range
- Rental community; rents not yet published
- Available units / sales status
- Rental lease-up planned; topped out late March 2026
- Price by bedroom configuration
- Rents not yet published; rental rate sheets will be requested once leasing launches
- Penthouse pricing
- Contact for current information
- Deposit schedule
- Rental community; no condo deposit schedule; application terms set by the property manager at leasing launch
- Developer incentives
- Contact for current information
Current pricing sheet for Metro Parc North.
Price lists, deposit schedules, and any developer incentives are shared privately with registered buyers after the sales team confirms today's numbers.
Request current pricingWhere a number is not published on this page, the row reads Contact for current information rather than guessing. Never treat an advertised starting price as the price of a specific available unit.
Architecture & residences
The building and residences at Metro Parc North.
The building profile below records what this page verifies about the tower and its residences: floor counts, unit mix, dimensions, finishes, and views. Anything the page does not state is marked Not verified rather than guessed. Layouts, dimensions, and pricing change as phases sell, so current floor plan documents, view matrices, and availability are shared with registered buyers.
- Towers / floors
- 8
- Total residences
- 661 rental apartments
- Residence types
- Studio-3 bedroom rentals, Retail
- Square footage
- Contact for current information
- Ceiling heights
- Not verified
- Finishes
- Not verified
- Kitchens
- Not verified
- Baths
- Not verified
- Smart-home features
- Not verified
- Parking & storage
- Not verified
- Views
- Not verified
The floor plans at Metro Parc North.
Layouts, dimensions, and pricing change as phases sell. We share current floor plan documents, view matrices, and availability with registered buyers.
Studio & One Bedroom
Studio-1 bedroom · On request
Rental plans across the 8-story building; dimensions shared by the leasing team once leasing opens.
Two & Three Bedroom
2-3 bedroom · On request
Larger family layouts; availability confirmed by the property team.
Full floor plan documents, view matrices, and current availability are shared privately with registered buyers.
Request floor plansAmenities & lifestyle
The amenity program at Metro Parc North.
The list below records every amenity this page verifies for the project. Where the status of an amenity is not documented on this page, confirm with the sales team whether it is planned or already operating before you rely on it.
Transit-oriented location at the Hialeah Metrorail and Tri-Rail station
More than 15,000 sq ft of ground-floor retail
Adjacent to Hialeah Hospital
Construction & completion
Where Metro Parc North stands today.
Completion dates on new construction are estimates, not promises: they shift with permitting, financing, and the pace of the build. Announced milestones below are the ones this page records; anything unverified is marked plainly, and the current timeline should be confirmed with the developer before you plan around it.
- Construction status
- Under Construction
- Estimated completion
- Late 2027 (est.)
- Announced milestones
- Groundbreaking February 2025; full eight-story height reached late March 2026; completion guided to late 2027
Estimated completion is the developer's target as recorded on this page and is not a verified delivery date. Where the timeline is not verified, current scheduling requires confirmation with the project's sales team.
Location & neighborhood
Where Metro Parc North sits.
Address, neighborhood position, and nearby attractions below are recorded from this page's own project notes. Drive times, walk scores, and ratings are never invented on this site; where they are not documented here, the community guide is the best next step.
- Street address
- 955 E 26th Street, Hialeah, FL (earlier filings cited 983 E 26th Street)
- City
- Hialeah
- County
- Miami-Dade
- Neighborhood
- Hialeah
- Position & nearby
- Phase 2 of the Metro Center development at the Hialeah Metrorail and Tri-Rail station, beside Hialeah Hospital
- Transport notes
- Adjacent to the Hialeah Metrorail and Tri-Rail station
Community guide
Hialeah
Neighborhood depth is being compiled for this area; the county new construction guide remains the best next step.
Ownership considerations
What to know before you commit.
General guidance for new construction buyers. Building-specific details are marked "Not verified" where they have not been confirmed for this project.
- Short-term rental policy
- Residential leases will be set by the landlord at leasing launch
- Minimum rental period
- Not verified
- Leasing / owner-occupancy rules
- Not verified; confirm current leasing and occupancy terms with the sales team
- HOA / condo fees
- Not published on this page; request the current budget before you commit
- Financing notes
- Not verified on this page; the deposit schedule above records the financing model this page states for the project, and loan terms are confirmed before contract
Closing costs
Florida buyer closing costs typically include title insurance, lender fees, county recording charges, prorated property taxes, and Florida documentary stamp tax on the purchase price. The exact figure for this project is not published on this page, so confirm the current estimate before you sign. Not verified.
Not verified
HOA and condo fees
New developments typically assess monthly HOA or condominium fees covering common areas, amenities, insurance, and building staff, with special assessments possible for capital projects. Monthly fees for this project are not published on this page; request the current budget. Not verified.
Not verified
Deposit process
Pre-construction purchases in Florida commonly require staged deposits across contract, groundbreaking, and closing milestones, held in escrow. The exact schedule for this project should be confirmed in writing with the developer before you commit. Not verified.
Not verified
Flood and wind insurance
Coastal Florida properties carry flood and windstorm insurance requirements that can add meaningfully to monthly carrying costs, and premiums have risen across the state. The current premium profile for this project is not published on this page; confirm with an insurance advisor. Not verified.
Not verified
Buyer questions
Metro Parc North, answered.
Pricing, deposits, timelines, the developer, and the investment case, answered directly. For the broader picture on South Florida new construction, browse the full FAQ hub.
New Construction South Florida FAQsWhat is the construction status of Metro Parc North?
The project is under construction: groundbreaking was held February 2025 and the building topped out at its full eight stories in late March 2026.
When will Metro Parc North be completed?
Completion is guided to late 2027. Delivery dates shift with construction and permitting, so confirm the developer's current schedule before planning around it.
Is Metro Parc North a condominium?
No. Metro Parc North is a 661-unit rental apartment project, so the evaluation for clients is the lease market when leasing opens.
Who is developing Metro Parc North?
Baron Property Group is the developer, with a $206 million construction loan from Post Road Group; architecture is by Modis Architects and the contractor is KAST Construction.
Explore Hialeah
Keep exploring Metro Parc North's market.
Community guide
Doral
Explore the areaCounty new construction
Miami-Dade County
View county guideNearby development
Metro Parc Hialeah
View projectNearby development
Ambar Station
View projectNearby development
Canarias at Downtown Doral
View projectDirectory
All new construction
Browse all projectsPre-construction access
Request pricing & floor plans for Metro Parc North.
Tell us the floor plans and views you are considering, and we will respond with current availability, pricing, deposit structure, and the contract terms that matter before you commit. Complete discretion, no obligation.
Current availability and pricing across the project
Deposit structure and contract terms, negotiated for you
Honest comparison against the resale market
Request pricing & floor plans: Metro Parc North
No obligation, complete discretion.